Product upgrades please visit
               
 
 

400伏低压电网接地故障监测判定

产品说明书(Instructio

DJKZC 漏电传感器(Leak

DJKFC 漏电采样器(Leak

380ABC DJKZ 总监控器

380ABCN DJKF PL丄

 

Contact:Manager yu
tel:13805308298
fax:0530-5162928
Address:Heze city of Shandong Province, Zhongshan East Road
        more>>

 

1、The weak link in the grid management is the low voltage; 2、The major problem in the low-voltage grid is earthing; 3、Manual earthing (mainly at the neutral point) is to attain the intentions; 4、Hiding earthing faults and accumulating them; 5、Introducing the lightning in the grid and thus causing lightning disaster 6、Increase the difficulty in grid management due to the unsteady power supply. 7、Monitor technology guarantee the grid-earth insulation; 8、Causing waste in power energy; 9、Leading to safety problem; 10、Speeding up deterioration of the grid; 11、Increase the supply of pollution 12、Decreasing the quality of the power energy. 13、Facilitate monitoring over the earthing fault so that the grid becomes easy in management; 14、Grid-earth insulation guarantees the safe use of power. 15、The grid can be operated safely, steadily, cleanly and economically 16Remove the manual earthing Eliminate the earthing fault.Monitor the fault earthing; [color]

>
 

ManualProducts


380ABC DJKZ 总监控器(Total detector)





  All rights reserved:Shandong Heze Dejia Power Monitoring Engineering Co., Ltd.  Technical Support:Baidu Heze

TEL:0530-5162928 13805308298  FEX:0530-5162928  Address:Heze city of Shandong Province, Zhongshan East Road   ICP, for the record:鲁ICP备09002899号